Pavement repair work resumes on U.S. 24.

Pavement repair work has resumed on U.S. 24 west of Defiance, reducing traffic to one lane in two stretches. The Ohio Department of Transportation began a project last year to repair the four-lane road’s concrete surface in that section and pave over top of it with asphalt. This work was paused last fall, and was scheduled to resume this spring.

Check Also

A number of car window vandalism in Defiance being investigated.

A number of car window vandalism in and around the town center, primarily on Saturday …