Bryan Contractor Installing Water Line Beneath Maumee River

Bryan Con­trac­tor S&S Direc­tional Bor­ing is fus­ing together seg­ments of a new water pipeline which will be pulled through a tun­nel bored beneath the Maumee River in Defi­ance. The 20 inch pipe will run 4 feet under the river and should be in place by the end of the month. It will replace a prob­lem­atic water line that rests on the bot­tom of the river and which has had to have leak repairs.

Check Also

If you don’t clear the snow and/or ice from your sidewalk, are you liable if someone slips, falls and gets hurt?

With Ohio getting deeper into winter with snowfall and cold temperatures, homeowners will be out …